Integrated Mixed-Model Assembly Line Balancing with Unskilled Temporary Workers
Abstract
This study extends a single-model assembly line balancing problem to an integrated mixed-model assembly line balancing problem by incorporating unskilled temporary workers, who enhance productivity. An integer program that minimizes the sum of total workstation costs and salaries of skilled permanent and unskilled temporary workers within a specific cycle time is developed. The proposed models is based on particular features of a real-world problem including simultaneous assignments of skilled permanent and unskilled temporary workers as well as precedence restrictions for the tasks.
Origin | Files produced by the author(s) |
---|
Loading...