Integrated Assembly Line Balancing with Skilled and Unskilled Workers - Advances in Production Management Systems: Innovative and Knowledge-Based Production Management in a Global-Local World - Part I
Conference Papers Year : 2014

Integrated Assembly Line Balancing with Skilled and Unskilled Workers

Abstract

In this paper, we extend the general assembly line balancing problem by designing an integrated assembly line and addressing the number of workstations and simultaneous assignments of skilled and unskilled workers. We develop a mixed integer program that minimizes the sum of total annual workstation costs and annual salaries of skilled and unskilled workers within a predetermined cycle time. Because this problem is NP-hard, we also develop a genetic algorithm to obtain efficient solutions for large problems. Numerical experiments demonstrate the efficiency of the random key-encoded genetic algorithm.
Fichier principal
Vignette du fichier
978-3-662-44739-0_56_Chapter.pdf (179.17 Ko) Télécharger le fichier
Origin Files produced by the author(s)
Loading...

Dates and versions

hal-01388577 , version 1 (27-10-2016)

Licence

Identifiers

Cite

Ilkyeong Moon, Sanghoon Shin, Dongwook Kim. Integrated Assembly Line Balancing with Skilled and Unskilled Workers. IFIP International Conference on Advances in Production Management Systems (APMS), Sep 2014, Ajaccio, France. pp.459-466, ⟨10.1007/978-3-662-44739-0_56⟩. ⟨hal-01388577⟩
208 View
351 Download

Altmetric

Share

More