Using L-M BP Algorithm Forecase the 305 Days Production of First-Breed Dairy
Abstract
Aiming at the shortage of conventional BP algorithm,
a BP neural net works improved by L-M algorithm is put forward. On the
basis of the network, a Prediction model for 305 day's milk productions
was set up. Traditional methods finish these data must spend at least
305 days, But this model can forecast first-breed dairy's 305 days milk
production ahead of 215 days. The validity of the improved BP neural
network predictive model was validated through the
experiments.
Origin | Files produced by the author(s) |
---|
Loading...